• Sumset International Trading Co.,Ltd
    ブルーノ・ナシメント
    高品質で手頃な価格の製品を提供してくれてありがとう
  • Sumset International Trading Co.,Ltd
    エフサン・サルマリ
    迅速な回答と専門的な態度により,私たちの協力はより円滑です!
コンタクトパーソン : kerry
電話番号 : 18150137563
Whatsapp : +8618150137563

ABB XVC768AE101 Current Monitor Board with 0 to 1000 A Measurement Range, ±0.5% High Accuracy and Rugged Construction

起源の場所 スウェーデン
ブランド名 YOKOGAWA
モデル番号 3BHB007211R0101
最小注文数量 1
価格 $1100
受渡し時間 5-7日
支払条件 T/T
供給の能力 999
商品の詳細
製品ID ABB XVC768AE101 3BHB007211R0101 電流モニターボード ブランド ABB
シリーズ 3BHB007211R0101 モデル番号 XVC768AE101
保証 1 関数 良い
状態 新しい
ハイライト

ABB XVC768AE101 current monitor board

,

current monitor board 1000A range

,

ABB 800xa high accuracy monitor

メッセージ
製品の説明
ABB XVC768AE101 3BHB007211R0101 Current Monitor Board
The ABB XV C768 AE101 is a current monitor board designed to measure current flow in industrial circuits. It supports a wide measurement range from 0 to 1000 A with a high accuracy of ±0.5%, making it suitable for applications in industrial automation, power generation, and energy management. Built with rugged construction, it withstands harsh conditions including vibration and shock, ensuring reliable performance. The module is easy to install and integrates well with various systems, offering flexibility for demanding environments.

Technical Specifications
Type
Power Supply module
Voltage
 220 V
Weight
0.1 kg
Dimensions
2.2 cm x 12.4 cm x 12.6 cm
Operating Temp.
-40°C to + 60°C
Product Images

ABB XVC768AE101 Current Monitor Board with 0 to 1000 A Measurement Range, ±0.5% High Accuracy and Rugged Construction 0ABB XVC768AE101 Current Monitor Board with 0 to 1000 A Measurement Range, ±0.5% High Accuracy and Rugged Construction 1ABB XVC768AE101 Current Monitor Board with 0 to 1000 A Measurement Range, ±0.5% High Accuracy and Rugged Construction 2
Installation Requirements
Professional installation is essential to ensure optimal performance, operational safety, and compliance with industry standards. Proper implementation is critical for reliable system integration and long-term operational efficiency.
  • Professional installation required for optimal performance and safety
  • Ensure proper mounting and adequate ventilation
  • Comply with all applicable electrical safety standards